Highway work taking place on Ruta 32 to Zurqui tunnel

Road crews are stripping old asphalt and applying new material on some 16 kilometers of Ruta 32 from the Río Virilla in north San José to the Zurquí tunnel.

Much of the work is being done from midnight to 5 a.m., said the Consejo Nacional de Vialidad. However, the daytime is when the new asphalt will be put down.

This entry was posted in Costa Rica News. Bookmark the permalink.