Atenas bridge promised to be ready by Feb. 10

Consejo Nacional de Vialidad photo
Workmen move sections of the bailey bridge

Road officials hope to have a new bridge in place at Santa Eulalia de Atenas by Feb. 10. This is on the road that connects the community with Grecia.

The old bridge with its wooden deck was declared a risk, said the Consejo Nacional de Vialidad. So a temporary one-lane bailey bridge is being installed. The cost of the project will be about 215 million colons or about $430,000, said the agency.

The bridge will be 55 meters or about 180 feet.

This entry was posted in Costa Rica News. Bookmark the permalink.