Highway officials say that they are almost ready to open two temporary bridges over a washout on the  Circunvalación. The remaining work involved building asphalt ramps to the structures. Work Sunday and Monday was impaired by sometimes heavy rain. The job is supposed to be done by this morning.

This entry was posted in Costa Rica News. Bookmark the permalink.